Equipment maintenance:
The equipment shall be thoroughly maintained and overhauled once a month (shut down for 4 hours).
1, daily maintenance:
Keep the external equipment clean and clean, check whether the gas supply pipeline and quick connection are good.
The upper and lower bearing seats and lifting screw lubrication (grease gun refueling).
discharge the water in the air filter.
Check the sand belt and make balance adjustments.
2. Weekly maintenance:
remove the mud left by daily maintenance, lubrication maintenance according to the daily maintenance requirements.
Check the conveyor belt and its tensioning (if the tensioning is too loose, please adjust to moderate).
Check the sand belt and its tension (if the tension is too loose, please adjust to moderate).





