The PC steel bar production line is a complete set of equipment used for producing steel bars for prestressed concrete. The following is a detailed description:

Production Line Components
Mechanical Devices: These mainly include the wire feeding device, straightening device, pulling device, quenching device, tempering device, shearing device, and winding device. These devices work together to complete the processes of feeding, straightening, pulling, heat treatment, shearing, and winding of the steel rods.
Electrical System: This consists of multiple high-power induction heating power supply units operating at different frequencies, automatic control and power distribution operating devices, etc. Through advanced IGBT-type induction heating power supplies and PLC system control technology, online automatic adjustment and monitoring of the production line are achieved.

Manufacturing Process
Raw Material Preparation: Low-alloy high-strength carbon steel wire rods are typically used as raw materials. These rods undergo quality inspection to ensure they meet production requirements.
Mechanical Descaling: Mechanical methods are used to remove scale and other impurities from the surface of the wire rods to improve the quality of subsequent processing.
Straightening: The wire rod is straightened using a straightening device to meet the required straightness for production.
Drawing and Diameter Reduction: The wire rod is drawn to the required diameter using drawing equipment. Grooves can also be added as needed to increase the bond strength between the steel bar and concrete.
Heat Treatment: This is a critical process in PC steel bar production, including quenching and tempering. During quenching, the surface temperature of the steel bar is gradually increased to a specified range and held there using induction heating, followed by rapid cooling. Tempering involves reheating the quenched steel bar to a certain temperature and holding it there to relieve quenching stresses and improve the overall mechanical properties of the steel bar.
Testing: The heat-treated steel bars undergo various performance tests, such as tensile strength, yield strength, and elongation, to ensure product quality meets the standards.
Coiling and Packaging: The tested and approved steel bars are coiled into rolls and then packaged for easy transportation and storage.








Production Line Features
High Efficiency and Energy Saving: Utilizing advanced induction heating technology and automatic control, it offers advantages such as fast heating speed, high energy utilization efficiency, and reduced power consumption.
Stable Quality: Through online automatic control and monitoring, high-precision tracking and digital display of quenching and tempering temperatures are achieved, ensuring a high product pass rate. It also features a comprehensive fault monitoring and protection system to ensure continuous, safe, and stable operation of the equipment.
Strong Applicability: It can be widely used in the production of various specifications of PC steel bars, such as Φ7.1, Φ9.0, Φ10.7, Φ12.6, etc.


Products Description

Hebei Hylite Machinery Co., Ltd. is located in the center of the Beijing-Tianjin-Hebei economic & technological region - Xianxian Economic Development Zone, where is the birthplace of motto "Seeking Truth From Facts". The factory covers an area of 50 acres. We are engaged in the R&D, manufacturing and sale service of equipment for steel bar and metallic wire processing.
A: Our company is a factory integrating production and sales. We can provide competitive prices and services.
Q:Where is your factory located?
A: Our factory is located in Cangzhou, Hebei Province of China.
Q: How many years are your company engaged in the wire wire processing?
A: More than 20 years. We have our own technology develop department and testing deparment.
Q: Can your company send your engineers to my country for machine installation, worker training?
A: Yes, our engineers went to more than 60 countries before. They are very experienced.
Q: What's the guarantee time for your machines?
A: Our guarantee time is 1 years since the machine was installed in your factory.
Q: Can you export and supply the customs clearance documents we need?
A: We have much experience for exporting. And we can supply the CE certificate, Form E, certificate of origin etc, your customs clearance will be no problem.
If you are interested in our machine, please contact us now.















